Extranet
/
Select the country:
En Fr De Nl Es It Pl Cz Ru

Latest news

Check archive ‹ Previous page



AECOM Wins International Competition for Master Plan of Rio 2016 Olympic Park

AECOM has announced as the winning firm for the international competition held for the master plan design of Rio 2016 Olympic Park. The first international architecture competition held in the country, the English firm is quite experienced in master plan’s for the Olympics as they were responsible for London’s 2012 Olympic Park Master Plan. The jury chose the winning project by AECOM with chief architect Bill Hanway and Brazilian project author Daniel Gusmão,  because of its unique concept of operation, separate access for athletes and the audience, logistics for the transport system, the viability of implementation and access for parking. In the legacy that the project will leave to the city, the highlights were environmental preservation and the viability of maintaining and preserving the lagoon.
 

The ceremony at the Maria Lenk Aquatic Park, located within the sports complex that will be the heart of the 2016 Olympic Games, was attended by authorities including the Sports Minister Orlando Silva, the mayor of Rio de Janeiro, Eduardo Paes and President of the IAB-RJ, Sergio Magalhães. The announcement of the three winning projects and the three honorable mentions demonstrated the international character of the contest: a Brazilian, an Australian and a Portuguese firm received the honorable mentions. As for the three winning projects, the third place went to the project signed by Portuguese architect Tomás Fernandes Almeida Salgado; the second, to architect Ron Turner, representing an American firm which was associated with the Brazilian firms CDC (Coutinho, Diegues and Lamb) and MPG (Miguel Pinto Guimarães ); the
winner was the English project.

“It’s a competition for the General Urban Plan. Soon, as announced by Mayor Eduardo Paes, the equipment that will compose the Park will be determined through specific architectural competitions in the next months,” says Sergio Magalhães, IAB/RJ president. Two scenarios were considered: the Olympic Games mode, which would ensure the best conditions for the performance of the sporting competitions, and the Legacy mode, which would ensure the viability of installing new, sustainable enterprises after the Olympics. The Olympic Park has an area of ​​1,18 million square meters and will host 15 Olympic and 11 Paralympics sports contests. In addition to the existing equipment – such as the Maria Lenk Aquatic Park, the Rio Arena and the Cycle Track -, the project includes the construction of temporary facilities (such as the hockey center, the tennis courts and the sponsors villa), permanent equipment (science and sports laboratory, athletic track, Olympic hall, media center and hotel, residential, commercial and leisure enterprises), and the preservation of the green areas system.

“The Olympic Park will be an urban development of international standard, which not only promotes the best in design, technology, sports and culture, but also satisfies intrinsic urgent and vital needs to its residents, businesses and the environment. Using our experience, we want to ensure that the investment and energy focused on the Barra neighborhood will promote the greatest possible benefit in the long term, “says Bill Hanway, an American who has been living in London for 14 years. He graduated from Washington University (St. Louis, MO), with a post-graduate degree from the School of Design at Harvard University. . In addition to the operational responsibilities for the global firm AECOM, Bill also provides the design leadership and management of multidisciplinary teams delivering projects in the UK, Continental Europe, the US and the Middle East. His UK work focuses on urban regeneration projects, spending the last five years on developing the London 2012 Olympic and Legacy master plan.

“Reconciling the needs of staging a global sporting event and of a successful and lasting new urban structure is a challenge that our three Master Plans propose to resolve by overcoming the large and small complexities of the Games, allowing a clear and practical approach for the project implementation. Our proposal is an Olympic park of international standard comprising permanent and temporary structures on which the new network of streets and squares of the future city will be located, “added the winner.
 
 
 
Source: ArchDaily
Related links: AECOM
 




 
Headlines
17-05 The Orbit tower is ready for the launch of the Olympic Games (text FR)
16-05 COBE Wins 2012 Nykredit Architecture Prize
15-05 The 10 biggest shopping centres in the world
14-05 HAO and Archiland Beijing Win Qingdao Master Plan Competition
12-05 Herzog & de Meuron, architects-archaeologists for the Serpentine Gallery (text FR)
11-05 AS+GG Designs Dancing Dragons Complex for Seoul’s Yongsan District
10-05 Daniel Buren fills the Grand Palais hall in Paris with colors (text FR)
10-05 Shelf Hotel by 3Gatti Architecture Studio
09-05 SOM’s newest building at Beijing’s China World Trade Center (CWTC) complex
08-05 Zaha Hadid’s Riverside Museum Wins European Museum Academy Micheletti Award 2012
07-05 J. MAYER H. Designs Series of Highway Rest Areas in Georgia
05-05 BIG designs cross towers in Seoul, Korea
04-05 3XN’s ‘The Arch’ Cultural Center Opens in Mandal, Norway
03-05 Badboot Lido Coming to Antwerp this Summer
02-05 Yabao Hi-Tech Enterprises Headquarter Park by 10 Design
30-04 Mikou Design Studio’s Swimming Pool Feng Shui
28-04 Jean Nouvel will build the « Duo » project in Paris (text FR)
27-04 New museum under construction in Datong, China
26-04 Cutty Sark by Grimshaw

Archi-Europe Archi-Europe Group Building Solutions Press Releases Links
Premium partners
                                        
                                        
                                        
                                   
Partners
                        
               
designed by infoweb